What Light Pole Banner Programs Actually Cost

There is no standard price for hanging a banner on a light pole. What a city, a downtown authority or a business district pays swings by an order of magnitude — and the reason has almost nothing to do with the banner.

What the public record says

Most banner pricing is quoted privately. The City of Austin publishes theirs, which makes it a useful reference point.

$200per pole, first week
$100per pole, each week after
$0of that covers printing the banner

The city neither designs nor fabricates banners. The customer prints them and delivers them to a city facility on a fixed schedule, five to ten business days ahead of installation.

What that adds up to

ProgramInstallation fees
20 poles, one four-week run$10,000
50 poles, one four-week run$25,000
20 poles, six runs per year$60,000 / year

Installation fees only. Banner design, printing, delivery and storage are on top.

Austin charges per pole — not per banner. A pole carrying two banners costs exactly the same as a pole carrying one. That single detail tells you what is actually being priced: the trip to the pole.

The cost is the visit, not the banner

A banner weighs almost nothing and costs a few dollars a square foot to print. What makes a banner program expensive is everything required to reach the top of a pole and come back down:

  • EquipmentA bucket truck or lift, plus the operator qualified to run it.
  • CrewTwo people minimum for most municipal installations.
  • Traffic controlLane closures, cones, flaggers, and sometimes a permit for each.
  • SchedulingWeather windows, road access, and coordination with the pole owner.
  • RepetitionEvery changeover repeats all of it. Six to ten times a year is typical.

What happens when the math breaks

Private quotes run higher than municipal schedules. A tourism organization in Grand Rapids, Michigan was quoted $500 per banner for installation and removal.

They stopped running banners.

That is the pattern worth seeing. These programs are not expensive because someone is overcharging. They are expensive because the installation method requires equipment and a crew. When that math breaks, the program does not get cheaper — it ends.

Every one of those cancelled programs is demand that did not disappear because the community stopped wanting banners. It disappeared because nobody could deliver them at a price the budget would carry.

Why EZBannerz exists

EZBannerz is a patented system for installing and removing light pole banners from the ground — no bucket truck, no lift, no lane closure. It does not change what banners cost to print. It changes what it costs to put them up and take them down, which is where the money actually goes.

For a facilities services company already working in a city, that turns a cost problem into a recurring revenue line on infrastructure their clients already own.

Running the numbers for your own program or territory?
Tell us the pole count and changeover frequency and we will work it through with you.

Start with the pilot calculator
Sources. City of Austin Transportation and Public Works, Street Banners program — published lamppost banner rates and applicant requirements; per-pole billing confirmed directly with the program office, September 2026. Grand Rapids figure is a quotation reported to EZBannerz by the recipient organization.